Timing
V 1.0 is planned for Nov./Dec. 2011?
Features
Management summary:
V 1.0 of the Trialox CMS will
- have proven stability (2 websites running Trialox CMS)
- have the DAM, how we know it at the moment (Sept. 2010) - probably some slight fixes for the usability, not more
- have a revamped Article Manager which will support dynamic configuration
- have a Page Manager which supports recent browser versions
- have a Page Manager with a version management system that everyone understands
- have a basic demo website installed, which acts as the documentation at the same time
- support multiple sites in multiple languages
The following list sows the todos for the release v 1.0 (more or minor high-level) - this should be replaced by a Jira Tickets list
- Page manager: Support for the most recent browsers (Firefox 3.6 (eventually 4), Google Chrome, Safari on Mac, Internet Explorer 7 & 8 (eventually 9))
- Overall: Basic fixes for style issues
- Article manager: Conceptual revamp and support for dynamically created article templates (no fancy GUI, just the functionality)
- Stability: Deadlocking and such behaviour should be fixed (we're near)
Considerations
With v 1.0 we would have to update:
- pandaclub
- WWF content and such
- Allianz Knowledge
- Clips?
And these projects are planned for the next months:
- panda.org: Mobile site of panda.org in Trialox
- End of September 2010
- panda.org: Move panda.org to Trialox in current design (demo stage)
- November 2010 + 2 months for final version (beginning of Feb.)
- panda.org: Action Center (CUG features)
- September
- WWF UK: Have beta version of WWF UK in Trialox
- February 2011
- WWF UK: Launch of WWF UK in Trialox and new design
- 29.4.2011
Labels
(None)